Sichuan Vacorda Instruments Manufacturing Co., Ltd

23 Years Focused on Level Measurement in Extreme Process Conditions

Manufacturer from China
Active Member
7 Years
Home / Products / Electromagnetic Flow Meter /

Separated Acid 220VAC Transmitter Low Cost Electromagnetic Flowmeter

Contact Now
Sichuan Vacorda Instruments Manufacturing Co., Ltd
City:zigong
Province/State:sichuan
Country/Region:china
Contact Person:MrNancy Lan
Contact Now

Separated Acid 220VAC Transmitter Low Cost Electromagnetic Flowmeter

Ask Latest Price
Video Channel
Place of Origin :Sichuan, China (Mainland)
Brand Name :VACORDA
Model Number :HKLD
Supply Ability :200 Piece/Pieces per Month
Packaging Details :Wooden box
MOQ :1 Piece/Pieces
Price :$200.00 - $500.00 / Pieces
Certification :CE/TUV/ISO9001/SGS
Product name :Separated acid 220VAC electromagnetic flowmeter
Medium :Conductive Liquid
Power supply :220VAC/24VDC/Battery
Output :4-20mA /4-20mA + Hart
Material :Carbon Steel/SS304/SS316L
Working temperature :-30~180℃
Working pressure :≤2.5Mpa
Connection size :DN10~DN2400
Port :Shanghai/Shenzhen
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Separated Acid 220VAC Transmitter Low Cost Electromagnetic Flowmeter

Product Description

HKLD type intelligent electromagnetic flowmeter is a fully intelligent electromagnetic flowmeter developed by our company using the most advanced technology at home and abroad. Its electromagnetic converter core adopts high-speed central processing unit. The calculation speed is very fast, the precision is high, and the measurement performance is reliable. The sensor adopts non-uniform magnetic field technology and special magnetic circuit structure, the magnetic field is stable and reliable, and the volume is greatly reduced, the weight is reduced, and the flowmeter is characterized by small flow.

Separated Acid 220VAC Transmitter Low Cost Electromagnetic Flowmeter

Product Parameter

Product Name

Electromagnetic Flowmeter

Repeatability error

+/-0.1%

Accuracy class

0.5 class, 1.0 class

Measured medium temperature

Common rubber lining: -20~+60 ° c

High temperature rubber lining: -20~+90 ° c

PTFE lining: -30~+100 ° c

High temperature vinyl lining: -30~+180 ° c

Rated working pressure

pipeline: DN10~DN65: ≤ 2.5MPa;DN80~DN150: ≤ 1.6MPa;

DN200~DN1200: ≤ 1.0MPa

Flow rate range

0.3~15m/s

Measured fluid conductivity

≥5μs/cm liquid

Output

4~20mA / 4~20mA + Hart

Electrode material

316L, titanium (Ti), tantalum (Ta), Hastelloy (H), Platinum (Pt) or other special electrode materials

Working power supply

85~265VAC / 24VDC / Battery

Straight pipe length

pipe: ≥ 5DN in the upper reaches, downstream of greater than or equal to 2DN

Connections

Flange

Protection grade

standard: IP65; IP68(optional)

Explosion-proof mark

mdllBT4

Detailed Images

Separated Acid 220VAC Transmitter Low Cost Electromagnetic FlowmeterSeparated Acid 220VAC Transmitter Low Cost Electromagnetic FlowmeterSeparated Acid 220VAC Transmitter Low Cost Electromagnetic Flowmeter

Precautions
1. Try to avoid ferromagnetic objects and equipment with strong electromagnetic fields, so as to avoid the magnetic field affecting the working magnetic field of the sensor and the flow signal.
2. should be installed in a dry and ventilated place, to avoid sun and rain, the ambient temperature should be -20 ~ +60 ° C, relative humidity is less than 85%.
3. There should be plenty of space around the flowmeter for easy installation and maintenance.

Installation requirements
The measurement principle of the electromagnetic flowmeter is that it does not depend on the flow characteristics. If there is a certain turbulence and vortex inside the pipeline, it will be generated in the non-measurement zone (such as elbow, tangential current limit or half-opening shut-off valve upstream). Measurement is irrelevant. If steady-state eddy currents in the measurement zone affect the stability of the measurement and the accuracy of the measurement, then some measures should be taken to stabilize the flow rate distribution:
A. Increase the length of the straight pipe before and after.
B. Using a flow stabilizer.
C. Reduce a section of the measuring point.

Inquiry Cart 0